Skip to content
Compliance Test Services
Toggle menu
  • About Us
    • What can CTS do for you?
    • Accreditation
  • Knowledge Center
    • Electromagnetic Compatibility and Interference [EMC / EMI]
    • Product Certification
    • CE Mark Testing
    • Dynamic Frequency Selection (DFS)
    • Industry Canada
    • FCC Part 15 Testing
    • National Voluntary Laboratory Accreditation Program (NVLAP)
    • Nationally Recognized Testing Laboratory (NRTL)
    • Supplier’s Declaration of Conformity
    • Voluntary Control Council for Interference
    • CISPR 32 / EN 55032
  • FAQ
  • Tools
  • Contact

Engineering References

SAR and MPE

  • SAR Measurement Requirements for 100 MHz to 6 GHz  
  • RF Exposure Procedures and Equipment Authorization 
  • RF Exposure Compliance Reporting and Documentation Considerations
  • Spreadsheet for MPE Calculations
  • SAR guidance for 802.11 transmitters

Permit But Ask

  • PRE-APPROVAL GUIDANCE PROCEDURE 
  • PRE-APPROVAL GUIDANCE LIST 

Permissive Change

  • PERMISSIVE CHANGE POLICY 
  • PERMISSIVE CHANGE FAQ  

Module or “Modular” Certifications

  • MODULE EQUIPMENT AUTHORIZATION GUIDE 
  • Module Radios FAQ

MIMO

  • Emissions Testing of Transmitters with Multiple Outputs in the Same Band
  • MIMO with Cross-Polarized Antenna
  • Directional Gain of IEEE 802.11 MIMO Devices Employing Cyclic Delay Diversity

Common RF Test Standards and Methods

  • Data transmission equipment operating in the 2,4 GHz band (ETSI 300 328 )
  • 5 GHz RLAN (ETSI 301 893)
  • 5,8 GHz fixed broadband data transmitting systems (ETSI 302 502)
  • Guidelines for compliance testing of U-NII devices
  • Guidelines for compliance testing of U-NII devices in bands 5 through 8
  • Wideband consumer signal booster
  • Industrial and non-consumer signal booster

Other

  • Determining ERP and EIRP 
  • DFS Testing (FCC) 
  • DTS System Measurement Guide 
  • FCC Measurement Procedures
© 2026 Compliance Test Services.